Engineering notes, postmortems, the changelog and the operational status of every region — the material an architect reads before putting a vendor in a design doc.
Sub-millisecond appends bought us a 6× write-latency advantage and a zonal failure domain we then had to engineer away. The gray-failure circuit breaker, the 30 ms abandonment rule, and the two production incidents that taught us to build it.
Read the post →Design partners get a shared channel with the engineers who wrote the write path. Everyone else gets the same people in public.
Available before you sign anything, not after. Where a certification is in progress we say so rather than implying it is done.
Report available under NDA. Continuous control monitoring, annual audit.
Signed at the Scale tier. No enterprise minimum, no usage premium.
Via Assured Workloads. Target Q2 2027 — do not plan a federal launch around it yet.
EU data residency in europe-west4. Subprocessor list published and versioned.
One email when we publish something substantial. Roughly twice a month, never about a funding round.